Saturday Nov 23, 2024
Saturday Nov 23, 2024

Vehicular movement resume on Beni-Darbang Road


Nepalnews
RSS
2022 Aug 13, 8:12, Myagdi
Beni-Darbang road Photo: Google maps

A two-way traffic service has resumed on Beni-Darbang road in Myagdi district.

The 24-km road connects the three local levels (Mangala, Malika, and Dhaulagiri rural municipalities) of Myagdi to the district headquarters- Beni.

Vehicular movement along the road was stopped on August 5 after the gabion wall was installed to protect the bridge over Dukhu River, pillars, and access road was swept away by the flood, informed Malika rural municipality-6 ward chair Patha Bahadur Roka.

Roka confirmed the resumption of traffic on the road since Friday after the construction of the gabion wall and protection of the bridge

READ ALSO:

Beni-Darbang Myagdi flood Bridge Beni-Darbang Road
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
[email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal