Saturday Nov 23, 2024
Saturday Nov 23, 2024

Traffic resumes in Karnali corridor road


Nepalnews
2021 Nov 05, 18:33, Kathmandu

The Karnali corridor road which was obstructed due to landslide at different sections has resumed.

The landslide debris that had deposited on the road at Bar, Gobrebhid, Kholibazaar and Simkhet along the Lalighat of Kalikot district to Sallisalla of Humla has been removed and traffic has resumed on this section of the corridor highway.

The landslide had deposited huge boulders at different places along the roadway. The Nepali Army had worked continuously to open the road.

Nepali Army Major, Prem Karki said the road has been opened after 15 days since it got blocked.

The Kalikot, Bajura and Humla folks faced much inconvenience due to the disruption of vehicular traffic. Karnali corridor roadway was obstructed due to the landslide triggered by incessant rains for four days since October 17.

READ ALSO:

landslide Humla Karnali Corridor Kalikot Nepali Army Bajura incessant rain
Nepal's First Online News Portal
Published by Nepalnews Pvt Ltd
Editor: Raju Silwal
Information Department Registration No. 1505 / 076-77

Contact

Kathmandu, Nepal,


Newsroom
##

E-mail
[email protected]

Terms of Use Disclaimer
© NepalNews. 2021 All rights reserved. | Nepal's First News Portal